亚洲成人精品在线免费,日本一区二区不卡网站,精品69视频一区二区三区网站,性色α√人人爽人澡人人妻蜜臀

High quality hydraulic equipment manufacturers!
TELL:+8613184968882

steel mill cylinder Sold to Estonia

Release time:2023-12-09 16:24:19 Hits: Current position: Home > News

This article mainly introduces:

Estonia hydraulic cylinder,steel mill cylinder manufacturer,steel mill cylinder

Estonia steel mill cylinder

(Estonia steel mill cylinder,produced by Hengyu Hydraulic Co., Ltd)

steel mill cylinder are widely used in Estonia,because of high work efficiency,excellent fatigue and impact resistance,no need for deceleration device.So our company has designed steel mill cylinder for customers from Estonia.

Introduction to steel mill cylinder:

steel mill cylinder piston rod material selection and technical requirements: (I), because there is no special requirements, so use 45 steel as the piston rod material, the design of the piston rod only withstand pressure stress, so no modulation processing; (ii) The coaxial tolerance of the shaft journal and the outer circle of the mounting piston is not greater than 0.01mm, so as to ensure the coaxial degree of the outer circle of the piston rod and the outer circle of the piston, and avoid the stuck phenomenon of the piston and the steel mill cylinder, the piston rod and the guide. The vertical tolerance between the end face of the mounting piston and the axis of the piston rod is not more than 0.04mm/100mm to ensure that the piston installation does not produce skew; (iii) The outer circle of the piston rod should pay attention to the roughness; (iv) Because it is operated under low load conditions, surface treatment is omitted.

Before the steel mill cylinder is removed, the relief valve should be loosened to reduce the pressure of the hydraulic circuit to zero, and then the power supply should be cut off to stop the hydraulic device. After loosening the oil port piping, the oil plug should be applied to plug the oil port.

1, the hydraulic machinery should be kept clean, in order to prevent dust and debris from falling into the oil, the tank should be sealed. 2, the oil in the tank should be replaced regularly according to the working condition. When changing the oil, the dirt and impurities accumulated at the bottom of the tank should be removed and the tank should be cleaned. 3, hydraulic oil, oil drums should be set in a clean and safe place to strengthen management. The oil drum, oil filter, oil funnel, oil pipe, etc. used should be kept clean. The oil drums for loading hydraulic oil must be cleaned in advance, and the oil drums should be dedicated and not mixed with other oil drums.

Do not regularly check the damage of the chrome layer of the steel mill cylinder: completely extend the steel mill cylinder and carefully check whether there is any surface damage such as injury, strain, welding slag, such as the surface damage position, in the steel mill cylinder block < 20cm, and the damage depth < 5mm, should be repaired in time to prevent long-term damage to the steel mill cylinder seal. Welding slag is strictly prohibited on the surface of the steel mill cylinder.

Answers to some questions about steel mill cylinder:

Two cylinders have a reversing control, if the load of the two cylinders is not the same, how to ensure their synchronization?
The piston rod of the cylinder is required to extend synchronization: install A shunt collector valve or synchronous motor at port A of the direction control valve, and then connect the two outlets of the shunt collector valve to the rod-free cavity of the two cylinders respectively. It is required that the outlet of the diverter collector valve is connected to the rod cavity of the two cylinders respectively when the piston rod is withdrawn in synchronization. The synchronization performance depends on the quality of the diverter valve and the leakage of the hydraulic system.

Why the injection cylinder retreating after the injection molding machine is started?
It is likely that the projected area of the molded plastic parts is large or the injection pressure set is relatively large, resulting in the expansion force exceeding the clamping force of the injection molding machine, so the mold is backward. You can do the following attempts: 1, reduce the injection force of the injection molding machine; 2, if the injection molding part can not be well formed by reducing the injection force, it is recommended to install the mold to a larger injection molding machine.

Back to list Recommended article

Leave a message if you have any questions.

Send
Email

Email:hsslrubbertech@gmail.com7x24 hours

Glad to receive your consultation!:

Service
Tel

+8613184968882
7x24hours service

Add
Wechat

Add Wechat
TOP
日本大香焦免费视频| 欧美日韩一区二区三区自拍| 国产精品综合色国产亚洲欧| 亚洲中文字幕在线视频一区| 亚洲精品伦理一区二区三区青春| 四虎成人精品一区二区| 中文字幕一区二区三区免费看| 精品国产片亚洲一区| 动漫无码AV在线免费观看| 亚洲精品在线观看日本国产| 精品日韩欧美一区在线播放| 亚洲成av一区二区三区| 成人网站在线进入爽爽爽| 中文字幕熟女一区二区三区| 久草视频在线视频在线视频在线观看| 中文人妻精品一区在线| 日本午夜免费福利视频| 国语自产精品视频二区在线| 欧美激情国产精品视频一区| 亚洲永久精品国产来久精品| 欧美亚洲综合中文字幕蜜桃成熟| 欧美黑粗大长在线不卡| 欧美日韩在线看免费看成人| 丰满少妇人妻久久久久久| 亚洲国产精品午夜在线| 久久久久久久久久久午夜福利| 欧美日本aⅴ一区二区三区| 国产av福利第一精品| 亚洲精中文字幕二区三区| 午夜福利国产观看视频1| 亚洲天堂网2020| 在线精品国产一区二区三区| 久草视频在线视频在线视频在线观看| 国产成人欧美日本在线观看| 国产亚洲欧美另类网爆在线| 精品国产污免费网站入口| 亚洲国产日韩一区二区三区| 久久久区一区二区三| 久久免费少妇高潮视频| 欧美大片在线免费看精品一区| 国产精品午夜福利在线观看|